Louisville Metro Government, Metro Development Center Green Roof

Jun 25, 2020 1:37:36 PM / by Luckett & Farley posted in Civil Engineering, Sustainability, Civic, Civic Government

0 Comments

ABOUT THIS PROJECT

Luckett & Farley provided design services for Louisville Metro’s first green vegetative roof on the Metro Development 444 South Fifth Street building. This project replaces the existing built up roof on the early 20th-century building with an extensive, low-maintenance green roof utilizing 160 tons of gravel, planting medium, trees, and over 10,000 indigenous plantings on the six-story, 12,000 SF roof. The green roof increases insulation value and decreases storm water runoff while reducing the heat temperature of the roof, mitigating contribution to heat island effect in the city.

Read More

Transit Authority of River City Maintenance Annex and Training Facility

Jun 25, 2020 1:27:39 PM / by Luckett & Farley posted in Sustainability, Civic

0 Comments

ABOUT THIS PROJECT

Luckett & Farley provided full architectural and engineering design services for this 17,000 SF, $4.7 million facility to accommodate additional maintenance functions for periodic maintenance and bus detailing. The facility also includes maintenance training bays and a second floor with training classrooms and administrative facilities. Sustainable highlights include an extensive green roof, windows, translucent wall panels, and roof skylights for daylighting, daylighting controls, grey water collection system for flushing toilets/urinals, energy efficient VRV (Variable Refrigerant Volume) mechanical system, and bioswale for storm water quantity and quality management.

Read More

Child Development Centers

Jun 24, 2020 9:30:19 PM / by Luckett & Farley posted in Sustainability, Federal Government

0 Comments

ABOUT THIS PROJECT

This project is a design build delivery of two child development centers on the Marine Corp Base Camp Lejeune in North Carolina. The two centers are located on two different areas of the base described as Midway Park Place and Tarawa Terrace. Building Information Modeling and Integrated Project Delivery was used throughout the design process.

Read More

Project Details

Services Provided null

MORE PROJECTS LIKE THIS