Marathon Refinery Chemical Storage & Mixing Facility

Written by Luckett & Farley | Jun 25, 2020 9:59:12 PM

ABOUT THIS PROJECT

Luckett & Farley provided architectural, structural engineering, HVAC, plumbing and electrical engineering for the Marathon Refinery.

The project consists of 3 pre-engineered metal buildings. The 6,420 SF Team Building is designed for blast resistance and serves as an employee personnel facility; the facilities includes administrative offices, locker rooms, showers and rest rooms, break rooms, and conference rooms. The 3,500 SF Equipment Shelter building is designed to store equipment and a small area is used for chemical storage. The 371 SF Chemical Injection Building is designed for chemical storage and mixing.